Xiamen Ji Yuan Stone Co.,Ltd.
Marble Medallion
Marble Medallion
Enhance the look of any space with our Marble Medallion. Made from high-quality marble, this elegant addition will add a touch of luxury and sophistication to your home or office. Its durability and timeless design make it a perfect choice for any interior. Elevate your decor with our Marble Medallion.
Feature | Details |
---|---|
Product | Marble Medallion Floor Tile |
Surface | Polished |
Color | Multi-Color |
Thickness | 16mm,20mm,and 30mm. |
MOQ | 20 square meters for slab or tiles. |
Usage | Floor,wall,countertop,sink and basin,stair,fireplace,stone carving handicraft,lines, door cover,windowsill,threshold, the line that play a base,wave lineup,etc. |
Finished | Polished,honed,natural aplit,saw-cut,pineappled,bushhammered,machine pulled,water-jet,chiseled,sandblast. |
Available sizes: |
|
Quality Control | Top quality.All products checked by experienced QC before pack. |
slab | plastic inside + strong seaworthy wooden bundle outside |
Delivery date | 15-30 days after the down payments. |
Payment | 30% deposit 20 days after delivery, remaining 70% payment T/T prior to delivery |
Sample | Free samples are available. |
1. Divide the large-area stone paving area into multiple independent small areas according to the building axis through accurate measurement, and measure and monitor the overall area to ensure the joint and flatness of the stone, and strictly control the joint width and height difference one by one. It can effectively solve the problems of seam and flatness control in large-area stone paving construction.
2. The use of on-site quality inspection, on-site pre-splicing numbering, etc., effectively solves the problems of large color difference between large-area stones, and difficulty in seaming due to different stone sizes, which is conducive to speeding up the construction progress of the project.
marble medallion is suitable for large-scale ground construction of various large-scale public buildings.
Use the construction drawings to refine the stone layout, determine the size of the stone in different areas, control the color difference of each area through the on-site pre-splicing number, after cleaning the base floor, use dry hard cement mortar for leveling layer construction, and control the leveling layer elevation through measurement , On-site selection of stones for trial arrangement and numbering, coating the marble medallion with protective liquid, plastering the mortar binding layer, and then pasting.
1. Process flow
Sweep the ground of the grassroots → calibrate the height, stretch the line → level the cement mortar → make the control point and line → select the material, test the row → brush the protective liquid → the mortar bonding layer → laying → caulking → cleaning
2. Operation points
1. Construction preparation before marble medallion paving
Stone paving and laying out the reference line of each district: the east-west direction is based on the central axis of the station control.
The above work must be repeatedly checked in terms of elevation, plane size, etc. to ensure the accuracy of the lofting line. The reference line of stone paving in each area is based on the building axis, and the axis is the control line in the north-south and east-west directions. The horizontal elevation is marked with the relative elevation, which is 1m above the completion surface of the relative elevation.
Benchmarks on the cylinders in each area need to be double-checked to confirm that they are correct before they can be used. Benchmarks must be clearly marked and marked with red paint. No other materials and items are allowed to be stacked around the benchmarks to block the view of the benchmarks.
According to the construction sequence of this project and the situation on site, the stone paving sequence of the entire station hall layer is from west to east, and from the south and north sides to the middle of the station hall. Due to the large amount of stone paving work on site, consider arranging the construction channel in the center line of the station hall, with a width of about 5m to ensure the horizontal transportation of stone and other materials. After the construction of other parts of the station hall is completed, the stone paving in the central construction channel is finally completed . It not only meets the requirements of cross-construction in the station hall and shortens the construction period, but also ensures the quality of large-scale stone paving and saves construction costs.
Expansion joint retention depth: From the stone slab surface to the concrete floor surface, the large area of stone is divided into several small pieces, and each small piece becomes a whole.
In this way, the internal force change caused by thermal expansion and cold contraction of the stone and the bonding layer itself is solved, and the internal force change is eliminated at the expansion joint, so as to avoid the stone from being squeezed and arched or the stone cracked. The strength of the floor slab is the weakest at the beam position, and it is easy to cause the deformation of the floor slab due to the uneven settlement of the foundation, and finally crack the stone.
Install the stone slabs according to the position of the expansion joint in the design drawing, and design the expansion joint at the position of the structural beam.