Xiamen Ji Yuan Stone Co.,Ltd.
Large Sandstone Panel
Large Sandstone Panel
This Large Sandstone Panel offers a beautifully natural and durable addition to any space. Made from high-quality sandstone, it provides a timeless aesthetic while also being resistant to wear and tear. Perfect for adding a touch of elegance to your home or outdoor area.
Feature | Details |
---|---|
Material | Natural Sandstone |
Surface Finished | Honed,Flamed,Bush-hammered,Brushed,Nature,Mushroom,Sawn etc |
Finished Products | Floor tiles, Wall cladding, Countertops, Windowsills, Special-shaped tiles, Small slabs, Swimming pool, steps, wall panel, flooring, veneers, slabs, coping tiles, etc |
Color | Yellow,black,white,red,purple wood,green,grey,rainbow etc |
Finished | Honed, Split, Sandblasted, Sawn, Antiqued, Pineapple, etc. |
Dimension |
|
Usage | Interior & Exterior Decoration |
Quality Control |
Thickness Tolerance:+/-0.5mm,+/-1mm; All Products Checked by Experienced QC |
MOQ | Welcome Small Trail Orders |
Size | Customized Pls contact us for the newest catalog of sandstone,marble,granite,quartz,mosaic,limestone,travertine etc |
Sample | Contact Us For Free Samples |
Package | Standard Exporting Seaworthy Package ( Inner: Plastic Film and Foam; Outer: strong seaworthy wood Crates or Pallets.)Payment |
Payment | T/T, L/C, Escrow, Western Union |
Delivery | Within 2 Weeks After Deposit |
Large Sandstone Panel Entry Management
1. Changes in Construction Schedule and Material Orders
Changes in the construction schedule due to cross-operations on-site and modifications requested by the owner impact the variety, specifications, quantity, and delivery schedule of design materials. To manage these changes efficiently:
- The revised material layout must be thoroughly planned.
- Orders should be placed promptly to ensure the timely formation of large sandstone panel materials.
- The bill should be sent to the purchaser without delay.
2. Handling Design Changes and Cancellations
In cases where design changes occur:
- Large sandstone panels that have already arrived on-site may need to be canceled.
- The owner must be informed promptly.
- A visa form should be confirmed with Party A to facilitate smooth project settlement.
3. On-Site Entry and Documentation Management
The process of managing large sandstone panels upon entry is critical and includes:
- Coordinating with suppliers to deliver materials in batches based on the approved schedule.
- Properly documenting received materials before transferring them to the designated storage area.
- Conducting material checks upon arrival, including counting, acceptance, and registration according to the material list.
If the same variety of large sandstone panels cannot be delivered at once due to supplier constraints or material shortages, timely follow-up is necessary, focusing on:
- Ensuring continuous communication with suppliers.
- Tracking the delivery schedule to minimize disruptions.
Share










